The Gezhouba Dam or Gezhouba Water Control Project on the Yangtze River is located in the western suburbs of Yichang City in central China's Hubei province. The dam sits a few kilometers upstream from downtown Yichang, just downstream of the fall of the Huangbo River into the Yangtze. Construction started on December 30, 1970 and ended on December 10, 1988. The dam has a total installed electrical capacity of 3,115 MW.
After rushing out of Nanjin Pass, the Yangtze River slows down and widens from 300 metres (980 ft) to about 2,200 metres (7,200 ft) at the dam site. Two small islands, Gezhouba and Xiba, divided the river into three channels. There the Gezhouba Project was built.
The facility boasts a generating capacity of 3.11 GW along with three ship locks, two power stations that generate 14,100 GWh of electricity annually, the 27 gates of the spillway, and the no flowing Dam on both banks. The dam is 2,595 metres (8,514 ft) long with a maximum height of 47 metres (154 ft). The reservoir has a total volume of 1.58 cubic kilometres (1,280,000 acre·ft).
The navigation lock No.2 on the third channel was, when built, among the 100 largest in the world. The lock chamber is 280 metres (920 ft) long and 34 metres (112 ft) wide, with a minimum draft of 5 metres (16 ft) at the sill. It provides passage for 10,000 ton ships.
Gezhouba Dam | |
---|---|
Locale | Yichang, China |
Dam and spillways | |
Height | 47 m (154 ft) |
Length | 2,595 m (8,514 ft) |
Impounds | Yangtze River |
Reservoir | |
Capacity | 1.58 km3 (1,280,000 acre·ft) |
Power station | |
Installed capacity | 3,115 MW |
Annual generation | 14,100 GWh |
This entry was posted on October 4, 2009 at 12:14 pm, and is filed under
Conventional Hydroelectricity in China
. Follow any responses to this post through RSS. You can leave a response, or trackback from your own site.