Baglihar Dam or Baglihar Hydroelectric Power Project is a run-of-the-river power project on the Chenab River. The Baglihar Dam is located in the southern Doda district of the Indian administered state of Jammu and Kashmir. This planning of the project started in 1992 and was approved in 1996; the construction began in 1999. The Baglihar Dam has the capacity of 900 MW after its completion. The estimated cost of the project is around USD $1 billion. The first phase of the Baglihar Dam was completed in 2004. With the second phase completed, on 10 October 2008, Prime Minister Manmohan Singh of India dedicated the 450-MW Baglihar hydro electric power project to the nation.

After construction began in 1999, Pakistan claimed that design parameters of Baglihar project violated the Indus Water Treaty (full text) of 1960. The Indus Water Treaty provided India with exclusive control over three eastern rivers ,Near Beacon tunnel while granting Pakistan exclusive control to three western rivers, including Chenab River. However it contained provisions for India to establish river-run power projects with limited reservoir capacity and flow control needed for feasible power generation. Availing this provision India established several run-of-the-river projects, with Pakistan objecting to these. Also in the case of the Baglihar and Kishan-Ganga projects, Pakistan claimed that some design parameters were too lax than were needed for feasible power generation and provided India with excessive ability to accelerate, decelerate or block flow of the river, thus giving India a strategic leverage in times of political tension or war.

During 1999-2004 India and Pakistan held several rounds of talks on the design of projects, but could not reach an agreement. After failure of talks on January 18, 2005, Pakistan raised six objections to the World Bank, a broker and signatory of Indus Water Treaty. In April 2005 the World Bank determined the Pakistani claim as a ‘Difference’, a classification between the less serious ‘Question’ and more serious ‘Dispute’, and in May 2005 appointed Professor Raymond Lafitte, a Swiss civil engineer, to adjudicate the difference.

Lafitte declared his final verdict on February 12, 2007, in which he upheld some minor objections of Pakistan, declaring that poundage capacity be reduced by 13.5%, height of dam structure be reduced by 1.5 meter and power intake tunnels be raised by 3 meters, thereby limiting some flow control capabilities of the earlier design. However he rejected Pakistani objections on height and gated control of spillway declaring these conformed to engineering norms of the day. India had already offered Pakistan similar minor adjustments for it to drop its objection. The Indus Waters Treaty of 1960 divided the Indus river — into which the Chenab flows — between the two countries and bars India from interfering with the flow into Pakistan while allowing it to generate electricity. However the key issue that any dam constructed by India should be strictly run of the river was rejected. Pakistan government expressed its disappointment at the final outcome. Both parties (India and Pakistan) have already agreed that they will abide by the final verdict.

The verdict acknowledged India's right to construct 'gated spillways' under Indus water treaty 1960.The report allowed pondage of 32.58 MCM as against India's demand for 37.5 MCM. The report also recommended to reduce the height of freeboard from 4.5 m to 3.0 m.

On June 1, 2010 India and Pakistan resolved the issue relating to the initial filling of Baglihar dam in Jammu and Kashmir with the neighbouring country deciding not to raise the matter further. The decision was arrived at the talks of Permanent Indus Commissioners of the two countries who are meeting. "The two sides discussed the issue at length without any prejudice to each other's stand...Indian and Pakistani teams resolved the issue relating to initial filling of Baglihar dam after discussions," sources said. Pakistan also agreed not to raise the issue further.

Baglihar Dam
Country India
Locale Jammu and Kashmir
Construction began 1999
Opening date 2008
Dam and spillways
Type of dam Gravity
Height 144 m (472 ft)
Length 317 m (1,040 ft)
Volume 1,800,000 m3 (63,566,400 cu ft)
Crest elevation 844.5 m (2,771 ft)
Spillway capacity 16,500 m3/s (582,692 cu ft/s)
Reservoir
Active capacity 15,000,000 m3 (12,161 acre·ft)
Inactive capacity 37,000,000 m3 (29,996 acre·ft)
Power station
Commission date Stage I: 2005
Stage II: 2008
Hydraulic head 130 m (427 ft) (gross)
Turbines Stage I: 3 x 150 MW Francis-type
Stage II: 3 x 150 MW Francis-type
Installed capacity Stage I: 450 MW
Stage II: 450 MW
Total: 900 MW